Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

<menu path> <link to F1 content>Inbound Receipt / Quality Check / Inbound Mass Check [REC030]

<intro text>

DATASCOPE can manage stock codes with inspection requirements in 2 ways, provided the SKU is flagged as inspection required in SYSPRO:

  1. Single stage inspection

Here the full quantity is received into SYSPRO inspection and the full quantity passes inspection. The DATASCOPE trackID remains ONHOLD until the quality module(s) release the stock, but the trackID can still be moved into a storage location/bin in the warehouse.

  1. Two stage inspection

In 2 stage inspection, the full quantity is received into SYSPRO inspection and remains there until the quality modules release the stock. Since the stock is not yet in stock in SYSPRO it cannot be bin transferred.

Two inbound Quality check functions are available for items that are flagged as inspection required. One is a simple pallet mass check where each new pallet of the affected stock code to receiving in an ON HOLD status and then must be placed on a weigh station linked DATASCOPE WMS to validate the mass. If the mass passes a simply percentage tolerance the pallet becomes ACTIVE and can be moved into the warehouse.

The second check is a very simple quality release function. No QC testing is managed here. It is expected that the client has their own QC system and simply wants to move pallets from ONHOLD to ACTIVE when they are happy to release them.

There is a larger quality module which handles tests and criteria at a stock code level.

Info

If you don’t like reading, you can watch the video.

Panel
panelIconId1f3a5
panelIcon:movie_camera:
panelIconText🎥
bgColor#DEEBFF

<link to YouTube video>

<link to PDF doc on my OneDrive>

Try it!

<content>


Want more?

Related Labels

<previous Link>

<next link>