This module is used to track Jobs jobs in production as it moves they move from one Operationoperation/Work Centre work center to the next Operationoperation/Work Centre. In some instances work center. Sometimes, a factory can have multiple Operation/Work Centre Centers where products are being manufactured. Large screens can be installed at each Operation/Work Centre Center to display this module - this is to assist users in managing the progress of the manufacturing process per Operation/Work CentreCenter.

The screens will then display all Jobs in production at a specific Operation/Work CentreCenter.

Users must then post labor against the SYSPRO Job and update the operation at each Operation/Work Centre, Center as it’s completed and moved on to the next Operation/Work CentreCenter.

  • To start use using this screen at a Work Centre Center, the filters applicable to that Work Centre Center must be configured. These filters will be different for each work area depending Depending on the number of Work Centres Centers (i.e., WORK1, WORK2, WORK3, WORK4, WORK5) in a factory, these filters will differ for each work area.

  • Setup the Include Jobs with Complete Operations by selecting the applicable (where the screen must be displayed) Work CentreCenter. This must be the Work Centre Center, where all Jobs are Posted, posted but not yet completed.

    • For example, set WORK3 work center jobs.

  • Setup the Exclude Jobs with Complete Operations by selecting the next Work CentreCenter. This is typically the next Work Centre Center in the process, but where the Jobs are already completed.

Page Tree Search
rootPageF1 help

SPECIAL FEATURES

  • None

TECHNICAL

  • <Where are the Work Centre setup / created>

SYSPRO REQUIREMENTS & Business objects used

  • Each operation (at each work area) must be set as a milestone operation in SYSPRO.

REFERENCE

WIP050

FUNCTIONALITY OVERVIEW

The factory status board can be used to track a job from operation to operation through the factory floor. Let us assume that your factory has 5 main work cells and every job passes from one cell to the next as it is being manufactured. Five large screens can be installed with on in each area. Then this factory status screens can be opened on each station and a set of Operations set. The screen will then show all jobs currently at this operation. 

The module requires that you are posting labor against the SYSPRO job and updating the operations as complete. Each operation will have to be set as a milestone operation in SYSPRO.  
 
STANDARD PROCESS

  • Set the "Include jobs with completed operations window

  • Set the "Exclude jobs with completed operations" window

  • Refresh the grid - you will see the jobs where the above criteria apply.

To explain the filters above. Let us say that you have 5 work operations that the jobs pass through. These are WORK1; WORK2; WORK3; WORK4; WORK5.

If you set the "Include jobs with completed operations as WORK3
And you set the "Exclude jobs with completed operations as "WORK4 and WORK5

Then:

    • For example: set WORK4 and WORK5 to be excluded.

  • Select the Refresh icon to load the data grid.

  • The screen will show all jobs where the WORK3 has been posted, but will exclude all jobs where

WORK 4
  • WORK4 and WORK5 are completed.

In other words
  • Therefore, you will

get
  • see all jobs

that are complete
  • completed at WORK3, but have not

yet
  • been processed at WORK4.

These are the filters that you would set on the screen based in WORK4's work cell. 

SPECIAL FEATURES

  • This screen expects that the company is updating OPeration postings in SYSPRO 

SYSPRO Requirements & Business objects used

  • None

DATASCOPE Table updates

to be completed*
Page Tree Search
rootPageF1 help

SPECIAL FEATURES

  • None

TECHNICAL

  • <Where is the Work Center setup / created>

  • Ensure the Work Centers are set up in the WMS Operations Cross Reference Table.

SYSPRO REQUIREMENTS & Business objects used

  • Each operation (at each work area) must be set as a milestone operation in SYSPRO.

REFERENCE

WIP050

STATUS

This is an archived module and no longer in use.